Umeå University's logo

umu.sePublikasjoner
Endre søk
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf
Golvavjämningsmassor
Umeå universitet, Teknisk-naturvetenskapliga fakulteten, Institutionen för tillämpad fysik och elektronik.
2017 (svensk)Independent thesis Basic level (professional degree), 10 poäng / 15 hpOppgave
Abstract [sv]

För att få plana golv att använda som golvyta eller lägga en annan golvyta på är olika avjämningsmassor en lösning. Med ett brett utbud av avjämningsmassor och svårigheter med att fördela avjämningsmassan jämt utöver en yta krävs en bred kunskap inom området. Vilka material, tillbehör och vilken typ av avjämningsmassa som används beror på vilken situation som är aktuell. Momentet för golvavjämning är ett fysiskt krävande arbete för kroppen, då det innefattar mycket tunga lyft och arbete i ställningar som inte är ergonomiska. Rekab Entreprenad AB har i skrivande stund inte all kunskap som behövs för att utföra och planera avjämningsarbete trots en bred kompetens inom företaget. Erfarenheter från tidigare utförda arbeten har inte dokumenterats och kunskapen har inte förts vidare. Att hyra in ett annat företag för att utföra momentet golvavjämning är något Rekab vill undvika eftersom det med rätt kunskap är mer ekonomiskt att utföra själv. Syftet med denna rapport är att underlätta för kommande personal på Rekab Entreprenad som skall genomföra momentet golvavjämning. Målet är att sammanställa en lättförståelig beskrivande manual om vad som är viktigt under arbetsberedning, arbetsmiljö, genomförande och erfarenhetsåterföring av momentet golvavjämning. Teorin visade att arbetsberedning, arbetsmiljö, produktion och erfarenhetsåterföring är alla fyra viktiga delar i en process. I arbetsberedningen sker all den planering som krävs inför produktion. När väl momentet kommer i produktion skall allt material, alla verktyg och personerna som behövs för att genomföra momentet finnas till hands. En väl genomförd arbetsberedning gör att produktionen får ett bra flöde och ger därför ett bättre resultat. Alla moment har arbetsmiljörisker som måste undvikas i den mån som går. Många risker går att undvika med hjälp av planering och noggrann riskundersökning där blandanat val av maskiner kan minska vibrationsrisken. Erfarenhetsåterföring sammankopplar hela projektet för att till nästa gång samma projekt eller delar i projekt skall förbättras, bli mer effektiv och därmed dra ner kostnaderna för projektet. En beskrivande manual för golvavjämning framtogs genom dialoger och diskussioner med Rekabs personal som varit involverade i arbetet. Information hur anställa tycker att dagsläget fungerar analyserades, det gav en fördjupning av vad de anställda tycker och tänker. För denna rapport ansågs det vara ett mer passande sätt att arbeta på än genom intervjuer eller enkätundersökningar då det ger snabbare svar och en mer öppen dialog kan hållas. När olika synvinklar på hur ett moment av golvavjämning genomförs sammanställdes resultatet av rapporten. I manualen presenteras alla de fyra olika delarna som beskrivits i teorin specifikt för momentet golvavjämning. Vad som är viktigt att tänka på, hur genomför man detta moment och vad som bör tas med i planerings samt erfarenhetsåterföring. Även om manualen följs noggrant och varje steg får den tid som krävs är resultatet varierande. Mycket handlar om övning och rutin av momentet. Byggtiden för ett helt projekt är lång och därför uppkommer momentet golvavjämning cirka en gång per år och svårigheter med att få övning och rutin i arbetet sker. Till skillnad från en firma som endast arbetar med golvavjämning och utför arbetet dagligen får mer övning och därför kan leverera ett bättre resultat.

Abstract [en]

To get a flat surface on the floor to either use it as the actual floor area or to put another floor finish on top of the surface, different grading masses is a solution. With a wide selection of grading masses and the difficulties to distribute the grading masses evenly across an area it demands a wide knowledge in the field. Which material, accessories and which type of grading mass which will be used depends on the current situation. The work stage for floor grading is physically demanding work for the body, because it involves heavy lifting and working in a position that is not ergonomic. Rekab Construction (Entreprenad) AB doesn’t have all the knowledge necessary to perform and plan floor grading-work even though there is a wide knowledge within the company. Experiences from previously performed work has not been documented for the knowledge to be passed on. To hire in another company to perform floor grading is something Rekab wants to avoid since it is economical to perform by yourself with the right knowledge. The purpose with this rapport is to make it easier for the future staff at Rekab Construction who will perform floor grading. The goal is to put together a comprehensible descriptive manual for a person without prior knowledge, know what is required and the important parts during job planning, work environment, execution and experience feedback for the work stage floor grading. The theory shows that the job planning, work environment, production and experience feedback are all important steps in a process. During the job planning stage, all the planning required for the production is done. When that stage comes during the production, all the material, tools and the people needed should be available. A well-made job planning creates a good flow in the production which leads to better results. Every part of the building process has safety risks which needs to be minimized. Most safety risks are avoidable with the help of planning and accurate risk study to be prepared for when they do appear. Other causes and problems such as noise, there is auxiliary tools like ear protection. Experience feedback connects the whole project to improve future similar projects, be more efficient and thus reduce the expenses for the project. A descriptive manual for floor grading was developed through dialogues and discussions with Rekab’s staff who are involved in the work. Information how the employees think about the current situation is and works are analyzed, which gives an insight into what the employees think. For this report, it was considered a more appropriate way of working than interviews or questionnaires as it provides faster answers and a more open dialogue can be held. When different viewpoints of how one element of screed performed, the results were compiled. The manual presents all the four different parts described in the theory specifically for the momentary floor grading. What is important to think about, how this element is carried through and what should be included in planning and experience feedback. Even though the manual is followed carefully, and every step gets the time it demands, the result is varied. Much is about practicing it and getting routine for floor grading. The construction period for a whole project is long therefor the momentary floor grading occurs once a year, which makes it hard to practice it and get a routine for it. Unlike a company that only works with floor grading and doing it daily which leads to getting more exercise and therefore can deliver a better result.

sted, utgiver, år, opplag, sider
2017.
HSV kategori
Identifikatorer
URN: urn:nbn:se:umu:diva-147995OAI: oai:DiVA.org:umu-147995DiVA, id: diva2:1209783
Eksternt samarbeid
Rekab AB
Fag / kurs
Byggteknik
Utdanningsprogram
Bachelor of Science Programme in Civil Engineering
Veileder
Examiner
Tilgjengelig fra: 2018-05-25 Laget: 2018-05-24 Sist oppdatert: 2018-05-25bibliografisk kontrollert

Open Access i DiVA

fulltext(1314 kB)331 nedlastinger
Filinformasjon
Fil FULLTEXT01.pdfFilstørrelse 1314 kBChecksum SHA-512
1cbbea946114a23c81f1f6af0ee520459e06feee7585f36318758891d551e637de1ff8ab11bca6fb8b053a8ffe52602e5e6f821a0e0093397da57b5d3d5b62a1
Type fulltextMimetype application/pdf

Av organisasjonen

Søk utenfor DiVA

GoogleGoogle Scholar
Totalt: 331 nedlastinger
Antall nedlastinger er summen av alle nedlastinger av alle fulltekster. Det kan for eksempel være tidligere versjoner som er ikke lenger tilgjengelige

urn-nbn

Altmetric

urn-nbn
Totalt: 143 treff
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf