umu.sePublications
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Kommuikation och informationshateringmetoder
Umeå University, Faculty of Science and Technology, Department of Applied Physics and Electronics.
2017 (Swedish)Independent thesis Basic level (professional degree), 10 credits / 15 HE creditsStudent thesisAlternative title
Cumunication and information managment practices (English)
Abstract [sv]

Kommunikation och informationshantering är områden där byggbranschen möter stora utmaningar. Tid och pengar går förlorade för många aktörer beroende på att detta inte fungerar tillräckligt bra. Vid entreprenaden Kub och Länk blev det stora problem i utförandeskedet och det var troligt att bristande kommunikation orsakade en del av dessa problem. Därför undersöktes kommunikations- och informationshanteringsmetoderna som använts vid projektet för att se om syftet med metoderna uppfyllts och om det fanns möjlighet till förbättringar. Studien baserades på sparade handlingar och intervjuer med personer som varit verksamma vid entreprenaden. Teorin som användes baserades på forskningslitteratur inom ämnet. Tillgänglig fakta granskades noggrant och jämfördes med hur teorin ansåg att metoderna ska användas. Metoderna graderades efter nivån av standardisering och struktur. Studien resulterade i att förbättringar gällande klassificering och arkivering av information föreslogs för Peab. Slutligen understryker studien vikten av ett företags gemensamma riktlinjer för att få alla att arbeta efter samma tillvägagångsätt.     

Abstract [en]

Communication and information management are areas where the construction industry faces major challenges. Time and money are lost for many companies when this does not function well enough. The contract Kub och Länk faced major problems in the execution phase. It was likely that lack of communication caused some of these problems and therefore the methods used during the project were examined. This to see if the purpose of the methods was met and if there was room for improvement. The study was based on previously saved documents and interviews with people involved in the contract. Theories used in the study were based on research literature on the subject. Available facts were examined carefully and then evaluated and compared to the appropriate theory. The methods were graded according to the level of standardization and structure. The study resulted in suggestions for improvement of classification and filing of information. The study also highlights the importance of company-wide guidelines to get everyone to work in line with the corporate method.

Place, publisher, year, edition, pages
2017.
National Category
Construction Management
Identifiers
URN: urn:nbn:se:umu:diva-130603OAI: oai:DiVA.org:umu-130603DiVA: diva2:1068593
External cooperation
Peab Anläggning AB
Subject / course
Byggteknik
Educational program
Bachelor of Science Programme in Civil Engineering
Supervisors
Examiners
Available from: 2017-01-26 Created: 2017-01-26Bibliographically approved

Open Access in DiVA

No full text

By organisation
Department of Applied Physics and Electronics
Construction Management

Search outside of DiVA

GoogleGoogle Scholar

Total: 49 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf