umu.sePublications
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Projekterings- och granskningsförbättringar: Identifiering av brister och förbättringsförslag för dessa i projekterings- och granskningsprocessen av arkitekthandlingar
Umeå University, Faculty of Science and Technology, Department of Applied Physics and Electronics.
2018 (Swedish)Independent thesis Basic level (professional degree), 10 credits / 15 HE creditsStudent thesisAlternative title
Design and review improvements (English)
Abstract [sv]

Fastec Sverige AB har specialiserat sig på totalentreprenader av idrottshallar, industribyggnader och kommersiella byggnader. Överlappet mellan projektering och produktion i totalentreprenader gör processen känslig för fel och brister i bygghandlingar. Därför vill Fastec utreda sina brister i projekterings- och granskningsprocessen av arkitekthandlingar och se vad som kan förbättras. Syftet med arbetet är således att identifiera eventuella brister och komma med organisationsanpassade förlagsrutiner och förbättringsförslag för dessa, för att effektivisera processerna inom projekteringen och minska felen i de handlingar som lämnar den.

För identifieringen av eventuella brister har tre projekt genomgått granskning, de har varit projekterade av interna och externa A-projektörer och ledda av projekteringsledare hos Fastec i Skellefteå. Handlingar som legat till grund för och lämnat projekteringen har granskats, så även avvikelserapporter från arbetsplatserna. Intervjusamtal och diskussioner med medverkande inom projekten samt övriga erfarna och kunniga medarbetare ur organisationen har genomförts. Även tidigare projekts erfarenhetsåterföringsprotokoll och allmänna brister i projekteringsarbetet har diskuterats i intervjusamtalen.

De resulterande mest frekvent förekommande bristerna som identifierats är dels avtalet och valet av externa konsulter, brister i målbilden som projekteringen skall arbeta efter. Dvs. vad produktionen förväntar sig av bygghandlingarna. Bestyckningen av dörrar med tillhörande uppställningsritningar och användandet av för många väggtyper. Ytterligare det låga nyttjandet av kapaciteten i de ritnings- och granskningsprogram organisationen har till sitt förfogande. Till sist en väldigt låg frekvensen av feedback och avvikelserapportering från arbetsplatserna inom projekten.

Förslagsrutinerna och förbättringsförslagen som bygger på de identifierade bristerna och som detta arbete kommit fram till som mest frekvent är: att förändra är att tidigt i projekteringsprocessen tillsammans med övriga deltagare inom projekten på Fastec, speciellt produktionen, skapa en klar målbild för vilken detaljnivå som förväntas av bygghandlingarna. Rationalisera projekteringen med funktionsbeskrivningar till dörrleverantörer som får genomföra bestyckningen, samt utnyttja mer av kapaciteten i de CAD- och granskningsprogram man har till sitt förfogande inom organisationen än vad som görs idag.

Abstract [en]

Fastec Sweden AB specializes in turnkey contracts of sports centers, industrial and commercial buildings. The overlap between design and production in turnkey contracts makes the process sensitive to defects and shortcomings in construction documents. Therefore, Fastec wants to investigate its shortcomings in the design and review process of architectural documents and see what can be improved. The purpose of the thesis is thus to identify possible shortcomings and deliver adapted proposal routines and improvement proposals for Fastec Sweden.

For the identification of possible shortcomings, three projects have been selected to be reviewed, they´ve been projected by internal and external architectual planners and led by project managers at Fastec in Skellefteå. Documents that form the basis for and completed architectural documents have been reviewed, as well as deviation reports from the worksite. Interview talks and discussions with participants in the projects as well as other experienced and knowledgeable employees from the organization have been completed. Even previous projects evaluation documents and general shortcomings in the design work have been discussed in the interview talks.

The resulting most frequently identified shortcomings are partly the agreement and the choice of external consultants and shortcomings in the target image that the design should work for, ie. what the production expects from the architectural documents. The design of doors and associated formation drawings and the use of too many wall types in the projects is also a common problem. So is the lack of utilization of the drawing and review programs the organization has at its disposal, as well as the low frequency of feedback and deviation reporting from the worksites.

Proposals and improvement measures based on identified shortcomings can be found at the end of the thesis. Those who this thesis have come to the most frequent and important to change is to create a clearer target image for the early stage of the design process together with the other participants in the projects, especially the production management. To clearify what level of detail is expected of the construction and architectural documents. Rationalize the design with functional descriptions for door suppliers who are required to complete the design, as well as utilize capacity on a larger scale than today in the CAD and reviewing programs available to the organization.

Place, publisher, year, edition, pages
2018. , p. 37
Keywords [sv]
Projektering Granskning Arkitekthandlingar brister bygghandlingar
National Category
Other Natural Sciences Building Technologies
Identifiers
URN: urn:nbn:se:umu:diva-149270OAI: oai:DiVA.org:umu-149270DiVA, id: diva2:1220481
External cooperation
Fastec Sverige AB
Subject / course
Byggteknik
Educational program
Bachelor of Science Programme in Civil Engineering
Presentation
A303, Håken Gullessons väg 20, Teknikhuset, Umeå (Swedish)
Supervisors
Examiners
Available from: 2018-06-19 Created: 2018-06-18 Last updated: 2018-06-20Bibliographically approved

Open Access in DiVA

No full text in DiVA

By organisation
Department of Applied Physics and Electronics
Other Natural SciencesBuilding Technologies

Search outside of DiVA

GoogleGoogle Scholar

urn-nbn

Altmetric score

urn-nbn
Total: 177 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf