Åtgärd för minskad genomloppstid: Förmontering av kranspetsutrustning
Umeå University, Faculty of Science and Technology, Department of Applied Physics and Electronics.
2018 (Swedish)Independent thesis Basic level (professional degree), 10 credits / 15 HE creditsStudent thesisAlternative title
Action for reduced throughput time : Pre-assembly of tilt grapple (English)
Abstract [sv]

Vimek AB är en, inom sitt segment, marknadsledande skogsmaskinsproducent belägen i Vindeln,Västerbotten. Deras produktion är uppdelad i två sektioner, en förmonteringsstation därstandarddelar kan monteras och lagerläggas, samt en slutmontering där alla delar monterassamman till en komplett maskin.Genom att flytta monteringsmoment från slutmonteringsgrupp till förmonteringsgrupp vill Vimekminska genomloppstiden för deras skotare 610 SE. Till Skotare 610 finns fem valbarakranspetsutrustningar där tiltgrip med bromslänk är den med god marginal främstförekommande.Projektets mål är att flytta tiltgrip med bromslänk från slutmontering till förmontering. Underlagtogs fram genom provmontage och intervjuer parallellt med en ständig dialog med montörer.Utifrån detta underlag beslutas att en förmonteringsstation med en fixtur om grund vara det somskulle passa in bäst hos Vimek. Monteringsfixturen konstrueras och monteras ihop på Vimek, ettnytt monteringsförfarande börjar ta form.Med hjälp av Vimeks montörer och sakkunnig personal inom kvalitét arbetades ett nytt konceptavseende montageinstruktion fram. Fokus på standardisering, förbättringsarbete och fortlöpandekvalitetskontroll har legat till grund för det nya konceptet.Projektet resulterade i en fungerande arbetsstation och en besparing av ledtiden med enbibehållen arbetsinsats. Nyckeln för detta projekt har varit ett gott samarbete med Vimekskunniga montörer och konstruktörer.

Abstract [en]

Vimek AB is a producer of forestry machinery located in Vindeln, Västerbotten. Their productionis divided in two sections, one preassembly group where standard components are beingassembled and put in stock, and one final assembly group who assembles all parts to a completemachine.By moving elements of assembly from the final assembly section to preassembly section Vimekwant to reduce the throughput time of the Vimek 610 SE forwarder. There is a selection of fivedifferent crane tip tools that comes with the Vimek 610 SE forwarder, where “tilt grapple withbrake linkage” is the most common choice by far.The goal for this project is to the move crane tip equipment “tilt grapple with brake linkage” fromfinal assembly section to preassembly section. A decision basis was formed through interviews,test mountings and a continual dialog with the assemble staff. The best way for Vimek to do thisis by designing a work station containing a mounting fixture. The fixture is constructed andassembled in Vimeks facilities. A new assembling procedure of the crane tip equipment starts totake shape.With the support of Vimeks assembling staff and competent personnel within quality a newconcept of assemble instructions is presented. Standardization, continual improvement andquality control has been the core of this new concept.This project resulted in a new work station for the preassembling section and a reducedthrougput time for the Vimek 610 SE forwarder. The key to this project has been a successfulcollaboration with Vimeks competent assemble staff and designers.

Place, publisher, year, edition, pages
2018. , p. 89
Series
MA ; 1811
Keywords [sv]
Förmontering, genomloppstid
National Category
Mechanical Engineering
Identifiers
URN: urn:nbn:se:umu:diva-149489OAI: oai:DiVA.org:umu-149489DiVA, id: diva2:1222217
External cooperation
Vimek AB
Subject / course
Maskinteknik
Educational program
Bachelor of Science Engineering in Mechanical Engineering
Presentation
Teknikhuset, Umeå universitet (Swedish)
Supervisors
Examiners
Available from: 2018-06-21 Created: 2018-06-21 Last updated: 2018-06-21Bibliographically approved

Open Access in DiVA

fulltext(19949 kB)4 downloads
File information
File name FULLTEXT01.pdfFile size 19949 kBChecksum SHA-512
8fef54eafe230ca2b50048f82259bd36a73d6c12bc84d1f21c9e035cbef9ccb22191bb9cb2704ad1925f850580814f02ced76e638ad0175bcf59d9a35d676e71
Type fulltextMimetype application/pdf

Search in DiVA

By author/editor
Lingwall, Kim
By organisation
Department of Applied Physics and Electronics
Mechanical Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 4 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 16 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf