umu.sePublications
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Just-in-time - En möjlighet för effektivisering i ett byggprojekt?
Umeå University, Faculty of Science and Technology, Department of Applied Physics and Electronics.
2019 (Swedish)Independent thesis Basic level (professional degree), 10 credits / 15 HE creditsStudent thesisAlternative title
Just-in-time – A possibility for increased efficiency in a construction project? (English)
Abstract [sv]

Vid dagens byggprojekt blir bristande utrymme på byggarbetsplatsen allt vanligare då det oftabyggs i tätbebyggda områden. Detta innebär att den traditionella lagerföringen påbyggarbetsplatsen blir svår och nya lösningar behöver hittas för att upprätthålla effektivitet ochgod arbetsmiljö.Just-in-time (JIT) har sitt ursprung i Lean och innebär att rätt material levereras tillbyggarbetsplatsen i rätt tid. Materialet lyfts sedan direkt in på sin slutliga plats i byggnadenistället för att lagras på byggarbetsplatsen.Syftet med denna studie är att undersöka hur företaget YIT Sverige arbetar i dagsläget och hurföretaget skulle kunna ha nytta av JIT vid byggnationen av en friidrottsarena i Gällivare.Friidrottsarenan byggs i tätbebyggt område och utrymmet är begränsat vilket innebär vissaproblem. Dessutom är Gällivare beläget i Norrbottens inland och avstånden till andra städer ärstora.Vid studien framkom att vissa problem som materialskador och bristande kommunikation frånleverantörer förekommer i olika projekt som YIT Sverige genomför. Dessa problem skullekunna undvikas genom användande av JIT. Det är dock svårt att beräkna de kostnader ellerkostnadsminskningar som JIT skulle kunna innebära då det aktuella projektet inte är genomförtännu och studien har en tidsbegränsning.Det finns även fler möjligheter för att förbättra effektiviteten och arbetsmiljö såsom metoden5S och att skapa långsiktiga relationer med leverantörer. Detta är en förutsättning för attanvända sig av JIT men även något som kan användas vid traditionell bygglogistik. Dessutomkan mellanlager vara ett alternativ om det inte finns möjligheter att fullt ut implementera JIT,det skulle innebära fördelar för effektiviteten och arbetsmiljön på byggarbetsplatsen även omalla fördelar med JIT inte nås.

Abstract [en]

During today’s construction projects lack of space on the construction site is becoming acommonly occurring problem since projects often are placed in urban areas. This means thattraditional storage on the construction site becomes difficult and new solutions need to be foundto maintain efficiency and good working environment.Just-in-time (JIT) originates from Lean production and means that the right material is deliveredto the construction site at the right time. The material is then directly placed in its final locationin the building instead of being stored at the construction site.The purpose of this study is to analyse how the company YIT Sweden is currently working andhow the company could benefit from JIT in the construction of an athletics stadium in Gällivare.The athletics arena is being built in an urban area and the space on the construction site islimited, which causes some problems. In addition, Gällivare is located in Norrbotten and thedistances to other cities are significant.The study showed that certain problems such as material damage and lack of communicationfrom suppliers occur in projects that YIT Sweden is managing. These problems could beavoided by using JIT. However, it is difficult to calculate the costs or cost reductions that JITcould bring as the current project is not yet finished, and the study has a short time frame.There are also other possible ways to improve efficiency and work environment such as themethod 5S and to create long-term relationships with suppliers. This is a prerequisite for usingJIT but also something that can be used in combination with traditional construction logistics.Another possibility is to use interim storage for material. It can be an alternative if there are nopossibilities for YIT Sweden to fully implement JIT. It would mean benefits for the efficiencyand working environment at the construction site even if the full potential of JIT is not fulfilled.

Place, publisher, year, edition, pages
2019. , p. 26
National Category
Construction Management
Identifiers
URN: urn:nbn:se:umu:diva-161381OAI: oai:DiVA.org:umu-161381DiVA, id: diva2:1334641
External cooperation
YIT Sverige
Educational program
Bachelor of Science Programme in Civil Engineering
Available from: 2019-08-12 Created: 2019-07-03 Last updated: 2019-08-12Bibliographically approved

Open Access in DiVA

fulltext(1114 kB)13 downloads
File information
File name FULLTEXT01.pdfFile size 1114 kBChecksum SHA-512
52addd1039ffcefd4a0d017a9882a90606b66750ddd5ab3374e17e8f7b3545c4cab7e0ff2df07aecaf28efd6b8a0fbb7be5ae31cb9b70b01eae4f0bf571ab80b
Type fulltextMimetype application/pdf

By organisation
Department of Applied Physics and Electronics
Construction Management

Search outside of DiVA

GoogleGoogle Scholar
Total: 13 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 38 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf