Umeå University's logo

umu.sePublications
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Vindkraft i relation till andra intressen om mark: Elbehov i Norrbottens län
Umeå University, Faculty of Social Sciences, Department of Geography.
2023 (Swedish)Independent thesis Basic level (degree of Bachelor), 10 credits / 15 HE creditsStudent thesis
Abstract [en]

The electricity demand in Norrbotten County is expected to increase from 8 TWh in 2019 to 107 TWh in 2050. A contributing role to the large electricity demand in Norrbotten County is that LKAB will make large investments within the company. LKAB's electricity needs will increase from 2 TWh in 2020 to 50 TWh in 2040. LKAB believes that wind power is one of the best options for getting energy quickly at a low cost. The land construction, which is a large wind power project in Piteå municipality, was planned to build 1101 wind turbines that would produce 10–12 TWh per year. To build all the wind turbines, a land area of 450 square kilometers needs to be used. If you start from the ground construction, they will need 5000-5500 wind turbines to produce 50 TWh of energy. The area that needs to be used to build 5000-5500 wind turbines is then 2000-2,250 square kilometers. This means that future wind power installations will need access to large areas of land. But there are other interests that also have an interest in the same land and may have to compete with wind power for land in the future. The purpose of the study is to investigate and analyze which other interests are competing with potential new wind power establishments for land in Norrbotten County and to contribute to future wind power projects being sustainable.

 

The result shows that there are other interests that are also interested in land in Norrbotten County. The result also shows that trade-offs are made between different interests and that wind turbines have an impact on us humans. The interests brought out in the study and which may compete with wind power for land in the future are, outdoor life, nature conservation, reindeer husbandry, national park, nature reserve, water protection area, natura 2000, the Armed Forces, unbroken mountains, cultural environment conservation, commercial fishing, facilities for communication and human interests.

Place, publisher, year, edition, pages
2023. , p. 48
Keywords [en]
Electricity shortage, Norrbotten län, conflicting interests, human interests and economic interests.
National Category
Human Geography
Identifiers
URN: urn:nbn:se:umu:diva-209842OAI: oai:DiVA.org:umu-209842DiVA, id: diva2:1767966
Subject / course
Examensarbete i Geografi, för kandidatexamen
Educational program
Programme in Urban and Regional Planning
Supervisors
Examiners
Available from: 2023-06-16 Created: 2023-06-14 Last updated: 2023-06-16Bibliographically approved

Open Access in DiVA

fulltext(2718 kB)224 downloads
File information
File name FULLTEXT01.pdfFile size 2718 kBChecksum SHA-512
1afd2b71184eef6391ee40f769545869036865b4fc4972e418ef6c8a5e2763fecc887fc3bb0cc98797ab70b825b9f62859ee805c924a44278d9dc25079877c77
Type fulltextMimetype application/pdf

By organisation
Department of Geography
Human Geography

Search outside of DiVA

GoogleGoogle Scholar
Total: 225 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 560 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf