Umeå University's logo

umu.sePublications
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Cost-benefit analysis of the Northern Norway line: A review and assessment of previous investigation, the cost-benefit methodology and political decision-making
Umeå University, Faculty of Social Sciences, Umeå School of Business and Economics (USBE), Economics.
2023 (English)Independent thesis Advanced level (degree of Master (One Year)), 10 credits / 15 HE creditsStudent thesis
Abstract [en]

Prior to undertaking major public infrastructure projects, various types of cost-benefit analyses are carried out. The purpose is to provide decision-makers with an objective basis upon which to determine whether a project should be completed or not, as well as to rank projects based on the net increase in aggregate societal welfare they are predicted to yield. Many real-life examples demonstrate that there is no obvious link between the conclusions of such investigations and the public opinion on the project in question. Moreover, several research articles have concluded that politicians place little emphasis on the outcome of cost-benefit analyses when deciding which projects to prioritise. Therefore, the primary research focus of this thesis is to explore potential explanations for these common discrepancies. In doing so, a case study is conducted using an example of a project that exhibits these discrepancies; a proposed railway project in northern Norway called Nord-Norge-banen. In particular, an investigation from 1992 which overall appears negative towards the project is examined in contrast to surveys indicating positive public opinion and the fact that the project has already been formally approved. The thesis explores both project-specific and more generally applicable topics by analysing the report both within the methodology it was based on and by investigating the methodology itself. It includes descriptive elements such as project and report reviews and so-called sensitivity analyses, as well as more normative aspects like methodological shortcomings and cognitive biases. As the thesis shows, there are several imprecisions, uncertainties, vulnerabilities, questionable aspects and lacks of completeness in the cost- benefit analysis methodology. It further finds that some of the aspects unaccounted for in scientific reports but emphasized by the public are arguably reasonable to consider, while others are more subjective and potentially influenced by self-interest or even subconscious irrationalities and inconsistencies. The thesis does not provide a definitive conclusion regarding the specific project or the extent of biases among individuals, politicians or scientific reports in general. However, it highlights various tendencies that collectively contribute to significant imperfections, both in the findings of cost-benefit analyses and in the public perception of a project. This hopefully helps to improve the understanding of these common discrepancies between scientific research and public perception.

Place, publisher, year, edition, pages
2023.
National Category
Economics
Identifiers
URN: urn:nbn:se:umu:diva-210125OAI: oai:DiVA.org:umu-210125DiVA, id: diva2:1770310
Available from: 2023-06-19 Created: 2023-06-19 Last updated: 2023-06-19Bibliographically approved

Open Access in DiVA

fulltext(1409 kB)173 downloads
File information
File name FULLTEXT01.pdfFile size 1409 kBChecksum SHA-512
80c1f97bff344232327f5583f3188c784f0c9073cb2978454df059fcdfe25c127eea2045569f91430c8596edf472fe20918ae3bddf3a8d09000bd660eaa570b4
Type fulltextMimetype application/pdf

By organisation
Economics
Economics

Search outside of DiVA

GoogleGoogle Scholar
Total: 173 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 399 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf