Umeå University's logo

umu.sePublications
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Strukturerad erfarenhetsåterföring och kalkyluppföljning: för förbättrad projektledning och kvalitetssäkring inom företaget
Umeå University, Faculty of Science and Technology, Department of Applied Physics and Electronics.
2024 (Swedish)Independent thesis Basic level (degree of Bachelor), 10 credits / 15 HE creditsStudent thesisAlternative title
Structured feedback and cost tracking : for improved project management and quality assurance within the company (English)
Abstract [sv]

Samhället är beroende av en fungerande byggindustri, men sektorn står inför betydande utmaningar vad gäller både produktivitet och lönsamhet. Ineffektivitet och slöseri uppskattas till cirka 30–35% av produktionskostnaden per projekt. Det är tydligt att det finns ett behov av effektivisering. En metod är att använda erfarenhetsåterföring men tillämpningen är såväl utmanande som tidskrävande. Genom att reflektera över tidigare erfarenheter och misslyckanden kan vunna insikter vara vägledande för framtida effektivare strategier. Integrering av erfarenhetsåterföring som en naturlig del av arbetsprocessen kan öka effektiviteten och underlätta erfarenhetsöverföring. Studien syftar till att utveckla en metod för att förbättra erfarenhetsåterföring och uppföljning i byggprojekt, med målet att förbättra arbetsmetoder och öka användningen av erfarenhetsåterföring i projekteringsfasen.  

En kalkyluppföljning genomfördes samt samtal, både enskilda och i grupp, under gruppsamtalen diskuterades tre frågeställningar utifrån AAR-metoden för att identifiera framgångar, förbättringsområden och lärdomar. Kalkyluppföljningen visade att det nuvarande arbetssättet är tidskrävande och ineffektivt. AAR-metoden framstod som ett användbart verktyg för erfarenhetsåterföring genom att synliggöra förbättringsåtgärder och på så vis bidra till verksamhetsutveckling. Resultatet betonade också vikten av organiserad kunskapshantering för effektiv erfarenhetsåterföring. Studiens resultat indikerar att de identifierade metoderna har potential att förbättra företagens hantering av erfarenhetsåterföring. En systematisk och organiserad erfarenhetsåterföring kan leda till betydande förbättringar i byggprojektens produktivitet och lönsamhet. De identifierade metoderna har alltså potential att förbättra företagens hantering av erfarenhetsåterföring. 

Abstract [en]

Society relies on a functioning construction industry, but the sector faces significant challenges regarding both productivity and profitability. Inefficiency and waste are estimated to account for approximately 30–35% of the production cost per project. There is a clear need for streamlining, with one approach being the utilization of experience feedback, although its application is challenging and time-consuming. By reflecting on past experiences and failures, insights can guide future strategies. Integrating experience feedback as a natural part of the work process can enhance efficiency and facilitate experience feedback. The study aims to develop a method for improving experience feedback and monitoring in construction projects, with the goal of enhancing work practices and increasing the use of experience feedback in the project planning. A calculation comparison was conducted along with discussions, both individually and in groups. During group discussions, three questions were examined using the AAR method to identify successes, improvements, and lessons learned. The calculation comparison showed that the current working method is time-consuming and inefficient. The AAR method emerged as a useful tool for experience feedback by highlighting improvement actions and contributing to organizational development. 

The findings also underscored the importance of organized knowledge management for effective experience feedback. The study's results suggest that the identified methods have the potential to improve companies' handling of experience feedback. A systematic and organized approach to experience feedback can lead to significant improvements in the productivity and profitability of construction projects. Thus, the identified methods have the potential to enhance companies’ management of experience feedback. 

Place, publisher, year, edition, pages
2024. , p. 22
Keywords [sv]
erfarenhetsåterföring, kunskapsåterföring
National Category
Construction Management Construction Management
Identifiers
URN: urn:nbn:se:umu:diva-228917OAI: oai:DiVA.org:umu-228917DiVA, id: diva2:1893336
External cooperation
Selbergs Entreprenad i Umeå Ab
Educational program
Bachelor of Science Programme in Civil Engineering
Supervisors
Examiners
Available from: 2024-08-30 Created: 2024-08-29 Last updated: 2025-02-14Bibliographically approved

Open Access in DiVA

fulltext(698 kB)114 downloads
File information
File name FULLTEXT01.pdfFile size 698 kBChecksum SHA-512
76ece8bd25e25e95c38a4010882966b3abb595c73588eabdf827357ed9059d77d30696108d85c920e1e1822aa1c7c26b9c184138afb1ca67fbada69fa4c54e6d
Type fulltextMimetype application/pdf

By organisation
Department of Applied Physics and Electronics
Construction ManagementConstruction Management

Search outside of DiVA

GoogleGoogle Scholar
Total: 114 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 219 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf