umu.sePublications
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Avvikelsernas påverkan på VA-produktion
Umeå University, Faculty of Science and Technology, Department of Applied Physics and Electronics.
2011 (Swedish)Independent thesis Basic level (professional degree), 10 credits / 15 HE creditsStudent thesisAlternative title
Abnormalties that effect water and sewage construction (English)
Abstract [sv]

Under de senaste åren har debatter hållits i media och byggbranschen angående ökade byggkostnader, andelen kvalitetsbrister samt det ökade slarvet på arbetsplatserna. Debatterna har medfört att byggbranschen måste agera. Som ett svar på denna kritik har många byggföretag en strävan att minska byggkostnaden genom att minimera resursförbrukningen och samtidigt öka effektiviteten. Forskning som genomförts visar att slöseriet på byggarbetsplatserna uppgår till 30-35% av produktionskostnaden. Studier visar även att 33 % av yrkesarbetarens arbetstid består i rent slöseri. Utredningarna menar att slöseriet på arbetsplatserna till viss del beror på avvikelser som uppkommer under produktionstiden av ett byggnadsverk.

Denna rapport omfattar en studie av de avvikelser som uppkommer vid VA-produktion som medför negativa konsekvenser och slöseri. Studien omfattar en identifiering av avvikelsernas orsaker, dess konsekvenser samt en kartläggning av hur entreprenören skulle kunna agerat för att undvika uppkomsten av dessa avvikelser. Syftet med rapporten är att identifiera avvikelser inom VA-produktion för att kartlägga storleksordningen på slöseriet. På detta sätt kan det fastställas inom vilket område förbättringspotentialen är störst för de entreprenadföretag som genomför entreprenader av denna typ.

Studien är genomförd som en fältstudie vid ett av Skanska Sveriges projekt i Umeå. Projektet innefattar nybyggnation av ett vatten och avloppssystem. Detta arbete är en del i nyanläggningen av en industrigata samt ombyggnationen av korsningen E12, Rödbergsvägen/Stickvägen till cirkulationsplats. Under studieperioden har uppkomna avvikelser, dess orsak och konsekvenser för den fortlöpande produktionen dokumenterats och analyserats. Fältstudien är främst genomförd som en observationsstudie under pågående produktion. Därutöver har litteraturstudier av tidigare forskning härrörande till slöseri i byggbranschen genomförts. Litteraturstudien visar att slöseriet är väl utbrett samt att det finns stor förbättringspotential genom att minimera avvikelser inom byggbranschen. Varför dessa avvikelser uppkommer samt hur de kan minimeras har varit utgångspunkten för litteraturstudien. Detta utgör grunden för denna rapport.

Studien visar att de vanligaste orsakerna till avvikelser inom VA-produktion är väder samt externa och mänskliga faktorer. Avvikelserna orsakade merarbete eller produktionsstopp vilket påverkade produktionen. Det rena slöseriet under undersökningsperioden uppkom till 5 % av anbudssumman för VA-arbetena. Om slöseritakten anses vara konstat under hela projektets gång innebär detta att 16 % av anbudssumman för VA-arbetena skulle utgöras av icke värdeskapande aktiviteter. Undersökningen visar även att 31% av yrkesarbetarnas arbetstid utgörs av rent slöseri. De åtgärder som kunde utförts för att undvika det uppkomna slöseriet var under studieperioden planering, att genomföra arbeten med rätt kvalitet första gången samt samordning inom arbetsplatsen.

Abstract [en]

During the past few years, there has been a debate in the Swedish media and in the construction industry about rising costs, inferior quality and carelessness on the construction site. This debate has caused the construction industry to act. As a response, many construction companies are trying to reduce construction costs by reducing resource consumption and increasing efficiency. Recent studies show that the waste at the construction site is 30–35% of the production cost. These same studies indicate that 33% of the hours worked are wasted and of no value to the customer. These studies highlight that the biggest waste on the construction site are caused by abnormalities arising during the production process.

This report consists of a study of the abnormalities that occur during water supply and sewage construction that cause negative consequences and waste. The study includes the identification of the causes of the abnormalities, the consequences they bring and a how they can be reduced. The purpose of this study is to define the size and source of the waste in order to understand which area has the best potential for improvement for companies completing this type of work.

This study has taken place at one of Skanska Sweden’s construction sites in Umeå, Sweden. This is a study of the construction of a water supply and sewage system, which is part of a larger project to establish an industrial street and the redevelopment of the junction E12, Rödbergsvägen/Stickvägen to a traffic circle. During the study period, the abnormalities and their consequences to production have been documented and analyzed.

The field research was conducted primarily through observation during ongoing construction. In addition to the field research, a literature review was conducted of earlier research documenting waste in the construction industry. Why abnormalities occur and how they can be minimized was the focus of the literature review and the basis of this study.

The study shows that the most common abnormalities encountered in water supply and sewage construction are the result of weather, external and human factors. The consequences of these abnormalities are work stoppage and unnecessary work. The abnormalities during the research period resulted in waste that equaled 5 % of the contracted price. If the waste rate was assumed to be constant during the entire project, 16 % of the contracted price would be dedicated to non-productive activity. The study showed that 31 % of work hours were wasted. The study shows that a number of abnormities could have been prevented. Generally the best way of reducing abnormalities is by planning, avoiding quality deficiencies, and by coordination at the construction site.

Place, publisher, year, edition, pages
2011. , 131 p.
Series
BY, 1104
National Category
Construction Management
Identifiers
URN: urn:nbn:se:umu:diva-58228OAI: oai:DiVA.org:umu-58228DiVA: diva2:547424
External cooperation
Skanska Väg och Anläggning
Educational program
Bachelor of Science Programme in Civil Engineering
Uppsok
Technology
Supervisors
Examiners
Available from: 2012-08-29 Created: 2012-08-28 Last updated: 2012-08-29Bibliographically approved

Open Access in DiVA

No full text

By organisation
Department of Applied Physics and Electronics
Construction Management

Search outside of DiVA

GoogleGoogle Scholar

urn-nbn

Altmetric score

urn-nbn
Total: 133 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf