umu.sePublications
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Blockritningar och dess användning i produktion
Umeå University, Faculty of Science and Technology, Department of Applied Physics and Electronics.
2011 (Swedish)Independent thesis Basic level (professional degree), 10 credits / 15 HE creditsStudent thesisAlternative title
Blueprints for in-fill walls (English)
Abstract [sv]

Arbetet handlar främst om en jämförelse mellan tre metoder att framställa blockritningar. Arbetets huvudsakliga syfte har varit detsamma från arbetets början till slut. Däremot har en del inriktningar förändrats under arbetets gång. Den första tanken var att endast göra en jämförelse mellan de olika metoderna, men ganska tidigt insåg jag att arbetet med den nya metoden kan vara svårt att lära sig vilket ledde till att en guide om arbetsgången upprättades som en del av arbetet. Tanken är att blockritningar för ett av Peabs kommande byggen skall upprättas genom den nya metoden.

Syftet med arbetet är att undersöka användbarheten av en ny metod för att ta fram blockritningar för utfackningsväggar. Denna metod har jämförts med tidigare metoder, det vill säga Autodesk AutoCAD (AutoCAD) och handritningar, för att få en bild av användbarheten. Arbetets syfte har även varit att skapa en guide för arbetsgången med arbetet i Autodesk Revit (Revit).

Arbetet är indelat i tre delar, en faktadel, en jämförelse och en guide. För faktadelen har en litteraturstudie uträttats kring teori om arbetets berörda delar. Fakta är hämtad från facklitteratur, internet och tidigare gjorda examensarbeten och rapporter. Jämförelsen är gjord genom upprättande av två blockritningar som skapats genom de tre metoderna. Resultaten har sedan jämförts i områdena förkunskapskrav, tidsåtgång, krav på utrustning, tydlighet/ noggrannhet på ritningar och informationsutbyte. Arbetets sista del, guiden, är gjord genom att arbetsgången är indelad i sex steg. Stegen är förklarade med text som är kompletterad med skärmdumpar tagna från Revit. Arbetet med beskrivningen resulterade i en 20-sidor lång guide.

Resultatet som framkommit av arbetet är att den nya metoden med Revit har fördelar jämt emot AutoCAD och handritningar. Det är dock tidskrävande att lära sig den nya metoden, och vid mindre väggblock har tidigare arbetssätt tidsmässiga fördelar.

Abstract [en]

The project is an investigation for a new method creating blueprints for in-fill walls. The original purpose of the project was only to make a comparison between different types of methods creating these blueprints. During the beginning of the work I realized that it is hard to learn how to perform the new method, and therefore I have created a guide about the procedure of the work with the new method. This project is made in cooperation together with a construction company called Peab. The idea is that the blueprints for the in-fill walls in one of Peabs upcoming constructions are going to be created with the new method.

The purpose with this work is to compare different type of methods creating blueprints for in-fill walls. The comparison is made for the three methods, AutoCAD, Revit and blueprints made by hand. The purpose with this project has also been to create a guide for the procedure of the work in Revit.

The first part is a study that describes the subjects in this project. The internet and literature has been used for gathering information. The second part is the comparison. The result has been compared in the categories entry requirement, running time, equipment requirement, clarity/ accuracy of the blueprints and the information that is gained in the blueprints. The third and last part is the result of the guide, which is divided into six steps. Each step is described in words and with illustrations from Revit.

The work is written in Swedish.

Place, publisher, year, edition, pages
2011. , 53 p.
Series
BY, 1110
National Category
Construction Management
Identifiers
URN: urn:nbn:se:umu:diva-58240OAI: oai:DiVA.org:umu-58240DiVA: diva2:547474
External cooperation
PEAB Sverige AB
Educational program
Bachelor of Science Programme in Civil Engineering
Uppsok
Technology
Supervisors
Examiners
Available from: 2012-08-29 Created: 2012-08-28 Last updated: 2012-08-29Bibliographically approved

Open Access in DiVA

No full text

By organisation
Department of Applied Physics and Electronics
Construction Management

Search outside of DiVA

GoogleGoogle Scholar

urn-nbn

Altmetric score

urn-nbn
Total: 354 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf