umu.sePublications
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Optimerad värmeleverans från Hedensbyverket
Umeå University, Faculty of Science and Technology, Department of Applied Physics and Electronics.
2011 (Swedish)Independent thesis Advanced level (professional degree), 20 credits / 30 HE creditsStudent thesisAlternative title
Optimized heat distribution from Hedensbyverket (English)
Abstract [sv]

Skellefteå Kraft AB har i dagsläget problem med det centrala fjärrvärmenätet i Skellefteå, då det vid vissa driftfall uppstår alltför låg tryckskillnad mellan fram- och returledningen i delar av nätet. På grund av detta låga så kallade differenstryck, kan kundernas värmebehov i dessa områden inte kan tillgodoses på ett tillfredställande sätt. Syftet med detta arbete har därför varit att med simuleringar undersöka möjligheten att lösa detta problem genom att ansluta en tryckhöjningsstation till fjärrvärmenätet. Tryckhöjningsstationen ska placeras så att den utöver att underlätta tryckhållningen av nuvarande fjärrvärmenätet även möjliggör en ökad framtida värmedistribution från Hedensbyn, där huvudproduktionen av fjärrvärmen i Skellefteå äger rum. Vidare ska även potentialen till en ökad elproduktion genom en sänkt framledningstemperatur värderas.

Det genomförda arbetet visar att den mest optimala placeringen av en tryckhöjningsstation är vid Moröskolan i Skellefteå. Med denna placering skapas goda förutsättningar för att kontrollera trycket i fjärrvärmenätet och att upprätthålla ett minsta differenstryck över abonnentcentralerna. Utifrån de simuleringar som gjorts framgår det att med en tryckhöjningsstation, är det möjligt att kunna distribuera uppemot 20 MW mer värme från Hedensbyn. En tryckhöjning av fjärrvärmenätet skulle i dagsläget möjliggöra en ökad eldistribution på ca 4-5,5 GWh/år. Med detta som underlag, kommer under våren 2011 projektering gällande tryckhöjningsstationen att påbörjas.

Abstract [en]

Skellefteå Kraft AB has currently problems with the central district heating network in Skellefteå concerning low pressure difference between the delivering, hot, and returning, cold, pipeline. Cause of this low so called differential pressure, the customers heating requirements in these areas is not fulfilled in a satisfying way. The intent of this project has been, with the use of simulations, to clarify if a solution can be possible by connecting an increasing pressure pump to the district heating network. A pumpstation will be placed in such a way that it improves the ability to control the pressurization of the district heating pipelines and also makes it possible to distribute more heat from Hedensbyn, where the main production of district heat in Skellefteå takes place. Determine if the increase in pressure may result in an increase in electricity production, by lowering the temperature of the outgoing water.

The result is this project shows that placing a pumpstation at Moröskolan is the most advantageous position. An increasing pressure pump at Moröskolan in Skellefteå would create more favourable conditions in order to control the pressure in the district heating network and maintain a minimum differential pressure. The simulations made shows that with a pumpstation, it is possible to distribute up to 20 MW more heat from the Hedensbyn. A pressure increase in the district heating network would currently allow for an increase in electricity distribution of approximately 4-5,5 GWh/year. Based on these results, the project concerning the pump is planned to begin during spring 2011.

Place, publisher, year, edition, pages
2011. , 75 p.
Series
EN11
National Category
Energy Engineering
Identifiers
URN: urn:nbn:se:umu:diva-58956OAI: oai:DiVA.org:umu-58956DiVA: diva2:550416
External cooperation
Skellefteå Kraft AB
Educational program
Master of Science Programme in Energy Engineering
Uppsok
Technology
Supervisors
Examiners
Available from: 2012-09-07 Created: 2012-09-07 Last updated: 2012-09-07Bibliographically approved

Open Access in DiVA

fulltext(7644 kB)684 downloads
File information
File name FULLTEXT01.pdfFile size 7644 kBChecksum SHA-512
ddf4ca0166e329fe1b1c71cbc7341a033002bcf88d6a61b0bde415b5b62e8fca9557c1d9ecd992a57b1cc603381ac9df428211fa90b6be43d06cdf988f4ab98e
Type fulltextMimetype application/pdf

By organisation
Department of Applied Physics and Electronics
Energy Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 684 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 201 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf