Energikartläggning av Martinsons Trä AB
Umeå University, Faculty of Science and Technology, Department of Applied Physics and Electronics.
2012 (Swedish)Independent thesis Advanced level (professional degree), 20 credits / 30 HE creditsStudent thesisAlternative title
Mapping of energy usage at Martinsons Trä AB (English)
Abstract [sv]

Detta är en rapport av ett examensarbete i Energiteknik, vilket har gjorts i form av en energikartläggning av företaget Martinsons Trä AB i Bygdsiljum. Vidare är detta arbete en del i NV Eko (ett näringslivsinriktat samverkansprojekt riktat direkt till företag och kommuner i Norr- och Västerbotten). Syftet med rapporten är att ge en djupare bild av hur energin används på Martinsons Trä AB:s sågverk i Bygdsiljum, genom att kartlägga energianvändningen på företaget, mer specifikt elanvändningen. Vissa prioriteringar gjordes utifrån produktionen, och delar av fabriken kartlades.

För att kartlägga användningen av elektricitet har mätningar gjorts, data inhämtats och samråd med anställda hölls.

Årsanvändningen uppskattades genom att mäta momentan elanvändning och sedan använda dessa siffror för beräkningar av totala användningen. Resultat av detta arbete innefattar statistik över kartlagda fabrikers elanvändning samt en rad åtgärdsförslag. På fabriken finns ett antal maskiner som skulle behöva service eller helt och hållet bytas ut.

Sågfabrikerna (tumstationen, intaget, såglinjen, råsorteringen samt spånhanteringen) beräknades använda 30 % årligen av den inköpta elektriciteten. Limträfabrikerna (Limträ 1, Limträ 2, Limträ 3 och Limträ 4) använder motsvarande 18 % och torkarna 40 %. Vidare framräknades att det årligen används 23 GWh totalt på Martinsons Trä AB:s anläggning i Bygdsiljum.

Investering av ett nytt befuktningssystem i Limträ 2 är något som behöver ses över. Tumstationens transformatormatning behöver översyn, med en separation av matning till nämnda fabrik, där Limträ 2 respektive Limträ 3 separeras från transformator 11. Vidare behövs översyn samt ersättning och ombyggnad av vissa maskiner inom Limträ-fabrikerna, samt att elanvändningen bör loggas mera kontinuerligt och noggrant.

Abstract [en]

This is a report of a master thesis in energy technology and has been done by mapping energy usage of the company Martinsons Trä AB. Furthermore, this thesis is a part of NV Eko. The purpose of the report is to give a wider image of how energy is used at Martinsons sawmill in Bygdsiljum by mapping specifically and especially the use of electricity in this case. Certain priorities were made, from a production view, and parts of the factory were mapped.

Measurements were made in order to map the usage of electricity, data has been collected and interviews were conducted.

The results of this work are statistics over the mapped factories due to the usage of electricity in the these, together with a number of suggestions of improvements. Such suggestions were that some machines need an oversight or replacing.

The use of electricity in the factories handling the raw material saw processing was calculated to be approximately 30 % of the electricity bought yearly. The factories concerned with the refining process use a corresponding 18 % and the drying facility uses 40 % of the totalt electricity yearly. It was also calculated that in total, Martinsons sawmill in Bygdsiljum uses 23 Gwh.

The investment of a new moisturising system in the second refining factory (4 in total) needs to be looked into. An oversight of the one of the saw processing factories transformer is needed and the feeding of electricity to the second refining factory needs to be separated from said transformer. Above mentioned measurement needs to be done with transformer 11 as well, separating the second from the third refining factory:s feeding.

Furthermore an oversight and replacing of certain machines within the refining factories is needed and also a more continuous logging of electricity usage should be implemented.

Place, publisher, year, edition, pages
2012. , 34 p.
Series
EN12
National Category
Energy Engineering
Identifiers
URN: urn:nbn:se:umu:diva-58960OAI: oai:DiVA.org:umu-58960DiVA: diva2:550430
External cooperation
Martinsons Trä AB
Educational program
Master of Science Programme in Energy Engineering
Uppsok
Technology
Supervisors
Examiners
Available from: 2012-09-07 Created: 2012-09-07 Last updated: 2012-09-07Bibliographically approved

Open Access in DiVA

fulltext(2119 kB)396 downloads
File information
File name FULLTEXT01.pdfFile size 2119 kBChecksum SHA-512
dfcd2ac8b4a6e23b5d1be2d66c22d0741ca49eb1272c93ad1ef2294e5c1c118596e89acee8673edb83c3ba863412eb87a6f2556ab724613fa0355796d2031a69
Type fulltextMimetype application/pdf

By organisation
Department of Applied Physics and Electronics
Energy Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 396 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 834 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf