umu.sePublications
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Energikartläggning av LKAB:s underjordsgruva i Malmberget
Umeå University, Faculty of Science and Technology, Department of Applied Physics and Electronics.
2013 (Swedish)Independent thesis Basic level (university diploma), 10 credits / 15 HE creditsStudent thesis
Abstract [sv]

Gruvan i Malmberget använde 258 GWh energi under 2011 fördelat på olika energislag där andelen visas i procent inom parentes nedan.

 

  • ·  El 183 GWh (71%)
  • ·  Diesel för fordonsbränsle 4 897 m3 eller 49 GWh (19%)
  • ·  Eldningsolja till panncentral 2 378 m3 eller 26 GWh (10%)

 

  • ·  Energianvändningen per producerat ton uppgick till 15,91 kWh/ton

 

Totala mängden råmalm som bröts i gruvan år 2011 uppgick  till 16 193 kton och energianvändningen var 257 609 MWh. Motsvarande siffror för 2005 var 14 035 kton råmalm och energianvändning var 219 392 MWh, vilket ger en siffra för energianvändning per producerat ton på 15,63 kWh/ton. Produktionen har ökat med 15,4% och energianvändningen med 17,4% från 2005 till 2011. Ökningen beror till stor del på att brytning sker på större djup och mer energi krävs för att transportera upp malmen till marknivå.

 

Energikartläggningen har genomförts med avseende på Malmbergets gruva och en jämförelse i energianvändning görs mot uppgifter i tidigare sammanställning från 2007(referensår 2005). År 2011 är valt som referensår för denna energikartläggning och det är därefter jämfört med 2005 års värden för att få en bild över hur energianvändningen har ändrats under de senaste åren. Kartläggningen är uppdaterad med den nya huvudnivån M1250 som började tas i drift under första halvan av 2011.

 

Åtgärdsförslagen i avsnitt 5 är diskuterade och förankrade med verksamheten. En uppdelning av ansvarsfördelning för de olika åtgärdsområdena är gjord där PS, PE / PI, TP och EP ingår som huvudansvariga. De åtgärdsförslag med störst besparingspotential har lyfts fram under varje ansvarsområde och bör prioriteras först. Prioriterade åtgärder är värmeåtervinning gruvventilation, mätning och uppföljning samt insatser för beteendeförändringar.

Abstract [en]

The LKAB mine in Malmberget used 258 GWh of energy in 2011, broken down by different types of energy where the share is shown as a percentage in the brackets below. • Electricity 183 GWh (71%) • Diesel 4897m

3 or 49 GWh (19%) • Fuel oil 2378 m3 or 26 GWh (10%) • Energy consumption per tonnes of production was 15.91 kWh/ton The total quantity of crude ore mined in 2011 amounted to 16 193 tonnes and energy consumption was 257 609 MWh. Corresponding figures for 2005 were 14 035 tonnes of crude ore and energy use was 219 392 MWh, which gives a figure for energy consumption per tonne of 15.63 kWh/ton. Production has increased by 15.4% and energy consumption by 17.4% from 2005 to 2011. The increase is mostly because the mining occurs at greater depths and more energy is required to transport the ore to ground level. The energy audit has been carried out with respect to the mine in Malmberget and a comparison of energy use is made with information from a previous compilation from year 2007 (base year 2005). Year 2011 is chosen as the base year for this energy audit and it is then compared to the 2005 values to get a picture of how energy use has changed since then. The survey is updated with the new main level M1250 which began to be operational during the first half of 2011. The proposed efficiency measures in chapter 5 are discussed and anchored within the company. A sectioning of responsibility for the different areas of action is made with PS, PE / PI, TP and EP included as head responsible. The proposed measures with the greatest potential savings have been identified for each area of responsibility and should be prioritized. Priority actions are ventilation heat recovery, measurement and monitoring, and interventions for behavior change.

Place, publisher, year, edition, pages
2013. , 39 p.
National Category
Energy Engineering
Identifiers
URN: urn:nbn:se:umu:diva-67775OAI: oai:DiVA.org:umu-67775DiVA: diva2:614034
External cooperation
LKAB
Educational program
Bachelor of Science Programme in Energy Engineering
Uppsok
Technology
Supervisors
Examiners
Available from: 2013-04-03 Created: 2013-04-03 Last updated: 2013-04-03Bibliographically approved

Open Access in DiVA

No full text

Search in DiVA

By author/editor
Apelqvist, Bo-Isak
By organisation
Department of Applied Physics and Electronics
Energy Engineering

Search outside of DiVA

GoogleGoogle Scholar

urn-nbn

Altmetric score

urn-nbn
Total: 300 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf