umu.sePublications
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
BIM i förvaltningsskedet
Umeå University, Faculty of Science and Technology, Department of Applied Physics and Electronics.
2013 (Swedish)Independent thesis Basic level (professional degree), 10 credits / 15 HE creditsStudent thesisAlternative title
BIM i facility management (English)
Abstract [sv]

Under det senaste årtiondet har byggbranschen genomgått en stor omställning från att arbeta med papper och penna till användningen av moderna ritverktyg som ger möjlighet att arbeta i 3D. I dagens 3D-modell finns det möjlighet att lägga in information om varje objekts egenskaper så som produktspecifikation, material, volym, placering, hållbarhet mm. När sådan information har lagts in i modellen har det skapats en Building Information Model(BIM) som har potential att effektivisera byggindustrins arbetsprocess och förvaltning. Som det ser ut idag används nästan bara BIM under projekterings- och byggskedet, men i förvaltningsskedet är det inte lika utbrett. Det känns som ett oerhört slöseri att inte dra nytta av BIM i byggnadens i särklass längsta tidsperiod, som sträcker sig över flera decennier. Många menar också att det är just i förvaltningsskedet de största ekonomiska fördelarna med BIM finns.Det har tidigare undersökts mycket om BIM men dessa undersökningar har framförallt handlad om BIM i projekterings- och byggskedet. Få studier har gjorts med fokus på förvaltningsskedet. Därför kommer detta examensarbetet således behandla BIM i förvaltningen.För att BIM ska nå sin fulla potential i förvaltningen finns det mycket som måste förbättras inom framförallt rutiner och programutveckling. Bl.a. måste förvaltaren vara med under projekteringen och visa på vad denne kommer att ha nytta av och därmed det projektören bör lägga in i modellen. Det arbete som läggs ner under projekteringstiden kommer att vara ekonomiskt lönsamt när man räknar på hela byggnadens livslängd . Till exempel kan projektörerna lägga in en tidsparameter samt ett underhållsintervall för varje byggnadsdel. Denna information skulle då kunna kopplas mot en mjukvara som använder information till att ge automatiska meddelanden när det är dags för fastighetens planerade underhåll. I förvaltningsskedet finns det stora möjligheter att minskakostnader med hjälp av BIM i underhållet, fördelarna har börjat visa sig och en del större förvaltare har börjat ställa krav på en produktmodell som går vidare in i förvaltningsskedet.

Abstract [en]

During the last decade the construction industry have undergone a big change, from working with paper and pencil to the use of modern drawing tools that provides an opportunity to work in 3D. In today's 3D models it is possible to add information about each object's properties such as product specifications, materials, volume, location, durability, etc. When these factors have been added into the Model a Building Information model(BIM) have been created which has the potential to streamline the construction industry work process and facility management. Today BIM is mostly used during the design and construction phase, while during the facility management phase little progress has been made. It feels like an incredible waste not to take benefit from BIM in the buildings by far longest period of time. Many also believe that it is in the facility management stage the greatest economic benefits of BIM can be found. A lot of studies has been done about BIM, but these studies have primarily dealt with BIM in the project preparation and construction stage. Few studies have been focusing on the facility management stage. Therefore this thesis will process the use of BIM in the facility management stage.For BIM to reach its full potential in the maintenance work there is much that needs to be improved, particular in the work procedures and program development. The facility manager must be involved in the project planning stage and show what he will have use of in the model. The deployment time must be allowed to cost money and take time. The resources that are used during the planning phase will be paid back many times during the buildings lifetime. For example the project planners can put a time parameter and a maintenance interval for each building section. This information could then be connected to a software that uses the information to provide automatic notification when it is time for the property's planned maintenance. In the management stage there is great prospects to save money by using BIM in the maintenance, the benefits has begun to appear and some major facility managers have begun to make demands on the product model that goes further into the management

Place, publisher, year, edition, pages
2013. , 25 p.
National Category
Construction Management
Identifiers
URN: urn:nbn:se:umu:diva-79504Local ID: BY1318OAI: oai:DiVA.org:umu-79504DiVA: diva2:642179
External cooperation
Akademiska Hus
Educational program
Bachelor of Science Programme in Civil Engineering
Supervisors
Examiners
Available from: 2013-08-21 Created: 2013-08-20 Last updated: 2013-08-21Bibliographically approved

Open Access in DiVA

No full text

Search in DiVA

By author/editor
Rylander, Marcus
By organisation
Department of Applied Physics and Electronics
Construction Management

Search outside of DiVA

GoogleGoogle Scholar

urn-nbn

Altmetric score

urn-nbn
Total: 211 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf