umu.sePublications
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Sammanställning och analys av underhållstoppsprocessen på PM1 och returfiberanläggningen hos Smurfit Kappa Kraftliner Piteå
Umeå University, Faculty of Science and Technology, Department of Applied Physics and Electronics.
2015 (Swedish)Independent thesis Basic level (university diploma), 5 credits / 7,5 HE creditsStudent thesisAlternative title
Summary and analysis of the work process for planned maintenance stops at PM1 and the recycled fiber plant : (English)
Place, publisher, year, edition, pages
2015.
National Category
Engineering and Technology
Identifiers
URN: urn:nbn:se:umu:diva-104445OAI: oai:DiVA.org:umu-104445DiVA: diva2:819806
External cooperation
Smurfit Kappa Kraftliner
Educational program
University Diploma Programme for Process Operators
Available from: 2015-08-31 Created: 2015-06-11 Last updated: 2015-08-31Bibliographically approved

Open Access in DiVA

No full text

By organisation
Department of Applied Physics and Electronics
Engineering and Technology

Search outside of DiVA

GoogleGoogle Scholar

urn-nbn

Altmetric score

urn-nbn
Total: 15 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf