Förstudie för en vindkraftpark på Malmölandet i Norrköping: En undersökning av förutsättningarna för en vindkraftpark på ett sen tidigare planerat område
Umeå University, Faculty of Science and Technology, Department of Applied Physics and Electronics.
2015 (Swedish)Independent thesis Basic level (degree of Bachelor), 10 credits / 15 HE creditsStudent thesis
Abstract [en]

This is a feasibility study that examines various aspects of building a wind farm on Malmön in Norrköping. The feasibility study deals with interests of conflict, park design, electrical connections, production calculation, financial calculations and operating- and timetable.

The report is divided into two distinct parts. First a theoretical part, which deals with conflicting interests, park design and electrical connections. Second a part with simulations dealing with production calculations, and financial calculations.

Opposing interests are mapped so that problem areas can be found, and help put focus on the right places at a future environmental impact assessment (EIA). There are a number of areas where planners have to assess on an EIA, this thesis point on the most important areas. There are a few areas of national interest and the Natura 2000 protection. Part of the area of the planned park is also within Norrköping Airport area of influence and an assessment must be made by the civil aviation authority (CAA) to determine if a wind farm on the location would affect the air traffic and if so, what part of the location would be affected. Furthermore, there is the area of a flight route for birds as well as an area that is a common livelihood for birds. These should be examined to see if wind power in the area can become a problem for these birds.

A production calculation has been implemented in the program WindPRO. This feasibility study has dealt with three different park designs with the wind turbine, Vestas V-126 3.3MW, which is the largest low wind turbine we found. Based on wind data, data for wind turbines, distance between turbines and other data we can do a calculation of how much energy the wind farm produces annually. Calculations were also made In WindPRO regarding sound levels and shadow creation. This is so that the wind farm will be designed so target values for noise and shadows are met. All park designs in this project has been designed so that the sound and shadow benchmarks for buildings nearby are met.

Based on production estimates, an economic calculation been carried out. The different park designs have between 7 and 11 wind turbines with an annual energy production of between 58 and 91 GWh per year. The wind turbines have been estimated to cost approximately 25 Mkr each, plus about 10 % of turbine cost for foundations, roads, power lines and other similar expenses. One calculation was made for the case the electric connection could be done directly to some of the industries in the location, for this simulation the cost over the wind mill was about 15 %. Under all these conditions, the project should be financially sustainable, with a payback period of about 6-11 years and a return of investment of 1-7 %.

Place, publisher, year, edition, pages
2015. , 26 p.
Keyword [sv]
vindkraft, förstudie, windpro, vindkraftpark
National Category
Energy Systems
Identifiers
URN: urn:nbn:se:umu:diva-105362OAI: oai:DiVA.org:umu-105362DiVA: diva2:824876
External cooperation
Wind4Shore AB
Subject / course
Energiteknik
Educational program
Bachelor of Science Programme in Energy Engineering
Supervisors
Examiners
Available from: 2015-06-23 Created: 2015-06-22 Last updated: 2015-06-23Bibliographically approved

Open Access in DiVA

fulltext(2531 kB)131 downloads
File information
File name FULLTEXT01.pdfFile size 2531 kBChecksum SHA-512
e318f56d78babfc943e72075007f34dd02c6233ef089a57d7d2680566af6767a00478b86092103cf7faa39d5e709704c9c48468c36b9fb3acea542b468cd12b5
Type fulltextMimetype application/pdf

Search in DiVA

By author/editor
Mähler, Viktor
By organisation
Department of Applied Physics and Electronics
Energy Systems

Search outside of DiVA

GoogleGoogle Scholar
Total: 131 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 119 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf