umu.sePublications
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Elkvalitetsutredning vid ett kartong- och massabruk
Umeå University, Faculty of Science and Technology, Department of Applied Physics and Electronics.
2016 (Swedish)Independent thesis Basic level (university diploma), 10 credits / 15 HE creditsStudent thesisAlternative title
Quality investigation regarding electricity at a board and pulp mill (English)
Abstract [sv]

Rapporten behandlar en elkvalitetsutredning vid Metsä Boards fabrik i Husum. Utredningen ska utföras eftersom fabriken har genomgått en förändring då kartong tillverkas istället för papper. Detta påverkar hur konsumtionen av el ser ut både vad gäller mängd men även hur den konsumeras. Exempelvis har många strömriktare ersatts av frekvensomriktare. Någon sammangripande bild av hur läget innan såg ut finns inte så en elkvalitetutredning kommer utföras på hela fabriken, även på massabruket där processen är lika som innan omvandlingen. Störningarna i elkvaliten som rapporten kommer behandla är, övertoner, spänningsdippar, flimmer och transienter med extra fokus på THD. Nivåerna på dessa störningar kommer jämföras med de avtal som finns med elleverantören samt med standarder och föreskrifter inom området.

Efter att enlinjeschemat på huvudfördelningen av el har granskats, samt genomgång om var befintlig mätutrustning finns installerad sätts en plan upp om hur utredningen skall utföras. Detta leder till att mätningar utförs på inkommande linjer från Gideåbacka transformatorstation som distribueras av Vattenfall, men även på underliggande mellanställverk inne i fabriken. Resultatet ger dels en helhetsbild men också en aning om var eventuella störningskällor kan vara placerade i fabriken.

Utredningen visar att elkvaliteten överlag är god, de störningar som ligger i närheten av de gränsvärden som finns är 7e övertonen på inkommande linjer HSM1 och HSM2. Utredningen visar att Metsä Boards fabrik i Husum inte är orsaken till uppkomsten av den höga övertonhalten. Problemet uppstår från det kondensatorbatteri som är anslutet till 44 kV-skenan i Vattenfalls transformatorstation i Gideåbacka, vilket skapar resonans med lasten som är ansluten.

Abstract [en]

This report contains an investigation on the quality of the distributed electricity to Metsä Board Mill in Husum. Because the Mill has gone through large changes in the process, the end product is nowadays cardboard instead of paper and an investigation is needed. These changes have lead to a different consumption of electricity, both of the amount and the way it is consumed. There’s no summarizing image of how the electricity quality looked like before therefore a full investigation of the whole factory is needed. That includes an investigation of the pulp mill that hasn’t gone through any changes. The report investigates disturbances such as THD, voltage dips, flicker and transients with extra focus on THD. The result of the measurements is compared to agreement that’s been signed with Vattenfall but also to regulations and standards that exist.

After the schedule of the main distribution of electricity for the factory has been studied, a plan is set for how the work should be done. Measurements is going to be taken at the incoming lines that are distributed by Vattenfall, but also at lower voltage transformers in the factory to be able to see where sources of disturbances might be.  

The result shows that the quality of the electricity overall is good, the only thing is that the 7th harmonic on the incoming lines sometimes is higher that the acceptable limits. Further the investigation shows that the factory itself isn’t the source of these distortions. The distortion comes from a VAr (reaktiv effect) capacitor bank that is installed at Vattenfalls transformer station in Gideåbacka. The capacitor bank creates resonance with the connected load and that leads to amplification of certain harmonics.

Place, publisher, year, edition, pages
2016. , 59 p.
Series
EL, 1516
Keyword [sv]
Elkvalitet, elkvalitetsutredning, övertoner, spänningsdippar, flimmer, transienter
National Category
Other Electrical Engineering, Electronic Engineering, Information Engineering
Identifiers
URN: urn:nbn:se:umu:diva-123154OAI: oai:DiVA.org:umu-123154DiVA: diva2:943490
External cooperation
Metsä Board Sverige AB
Educational program
Högskoleingenjörsprogrammet i Elkraftteknik - nätbaserat
Supervisors
Examiners
Available from: 2016-07-05 Created: 2016-06-28 Last updated: 2016-07-05Bibliographically approved

Open Access in DiVA

fulltext(1953 kB)70 downloads
File information
File name FULLTEXT01.pdfFile size 1953 kBChecksum SHA-512
ab81958a57b883029d4158c8d53c2a81ebcf6f2357c3cf77f0177ac819deb7eca5d2dccde699d995ae628c5adf1db5bb2640ec8f727d2e7254c30cc92875a305
Type fulltextMimetype application/pdf

By organisation
Department of Applied Physics and Electronics
Other Electrical Engineering, Electronic Engineering, Information Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 70 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 662 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf