Umeå universitets logga

umu.sePublikationer
Driftstörningar
Det förekommer återkommande driftstörningar på några av sök-portalerna på grund av hög belastning. Vi arbetar på att lösa problemet, ni kan tillfälligt mötas av ett felmeddelande.
Ändra sökning
RefereraExporteraLänk till posten
Permanent länk

Direktlänk
Referera
Referensformat
  • apa
  • ieee
  • vancouver
  • Annat format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annat språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf
Embedding ensemble learning into simulation-based optimisation: a learning-based optimisation approach for construction planning
Department of Construction Management, Key Lab of Structures Dynamic Behavior and Control of the Ministry of Education, Harbin Institute of Technology, Harbin, China; Key Lab of Smart Prevention and Mitigation of Civil Engineering Disasters of the Ministry of Industry and Information Technology, Harbin Institute of Technology, Harbin, China; Department of Civil, Environmental, and Natural Resources Engineering, Luleå University of Technology, Luleå, Sweden.
Department of Civil, Environmental, and Natural Resources Engineering, Luleå University of Technology, Luleå, Sweden.
Umeå universitet, Teknisk-naturvetenskapliga fakulteten, Institutionen för tillämpad fysik och elektronik. Department of Civil, Environmental, and Natural Resources Engineering, Luleå University of Technology, Luleå, Sweden.
Department of Construction Management, Key Lab of Structures Dynamic Behavior and Control of the Ministry of Education, Harbin Institute of Technology, Harbin, China; Key Lab of Smart Prevention and Mitigation of Civil Engineering Disasters of the Ministry of Industry and Information Technology, Harbin Institute of Technology, Harbin, China.
Visa övriga samt affilieringar
2023 (Engelska)Ingår i: Engineering Construction and Architectural Management, ISSN 0969-9988, E-ISSN 1365-232X, Vol. 30, nr 1, s. 259-295Artikel i tidskrift (Refereegranskat) Published
Abstract [en]

Purpose: Simulation-based optimisation (SO) is a popular optimisation approach for building and civil engineering construction planning. However, in the framework of SO, the simulation is continuously invoked during the optimisation trajectory, which increases the computational loads to levels unrealistic for timely construction decisions. Modification on the optimisation settings such as reducing searching ability is a popular method to address this challenge, but the quality measurement of the obtained optimal decisions, also termed as optimisation quality, is also reduced by this setting. Therefore, this study aims to develop an optimisation approach for construction planning that reduces the high computational loads of SO and provides reliable optimisation quality simultaneously.

Design/methodology/approach: This study proposes the optimisation approach by modifying the SO framework through establishing an embedded connection between simulation and optimisation technologies. This approach reduces the computational loads and ensures the optimisation quality associated with the conventional SO approach by accurately learning the knowledge from construction simulations using embedded ensemble learning algorithms, which automatically provides efficient and reliable fitness evaluations for optimisation iterations.

Findings: A large-scale project application shows that the proposed approach was able to reduce computational loads of SO by approximately 90%. Meanwhile, the proposed approach outperformed SO in terms of optimisation quality when the optimisation has limited searching ability.

Originality/value: The core contribution of this research is to provide an innovative method that improves efficiency and ensures effectiveness, simultaneously, of the well-known SO approach in construction applications. The proposed method is an alternative approach to SO that can run on standard computing platforms and support nearly real-time construction on-site decision-making.

Ort, förlag, år, upplaga, sidor
Emerald Group Publishing Limited, 2023. Vol. 30, nr 1, s. 259-295
Nyckelord [en]
Construction planning, Information and communication technology (ICT) applications, Novel method, Optimisation, Simulation
Nationell ämneskategori
Annan samhällsbyggnadsteknik Byggprocess och förvaltning
Identifikatorer
URN: urn:nbn:se:umu:diva-191333DOI: 10.1108/ECAM-02-2021-0114ISI: 000691298400001Scopus ID: 2-s2.0-85113891374OAI: oai:DiVA.org:umu-191333DiVA, id: diva2:1627517
Tillgänglig från: 2022-01-13 Skapad: 2022-01-13 Senast uppdaterad: 2026-03-12Bibliografiskt granskad

Open Access i DiVA

fulltext(3131 kB)186 nedladdningar
Filinformation
Filnamn FULLTEXT02.pdfFilstorlek 3131 kBChecksumma SHA-512
a9b96cfd2849e93cdb548effb91063ef416716a6d6ce950e32bb80d41c1a07fddbeafbbc3ef24f541fdeb39766cf2ebf41af97cc1dd4a54d05b699cbf9dfa266
Typ fulltextMimetyp application/pdf

Övriga länkar

Förlagets fulltextScopus

Person

Lu, WeizhuoYang, Bin

Sök vidare i DiVA

Av författaren/redaktören
Lu, WeizhuoYang, Bin
Av organisationen
Institutionen för tillämpad fysik och elektronik
I samma tidskrift
Engineering Construction and Architectural Management
Annan samhällsbyggnadsteknikByggprocess och förvaltning

Sök vidare utanför DiVA

GoogleGoogle Scholar
Totalt: 328 nedladdningar
Antalet nedladdningar är summan av nedladdningar för alla fulltexter. Det kan inkludera t.ex tidigare versioner som nu inte längre är tillgängliga.

doi
urn-nbn

Altmetricpoäng

doi
urn-nbn
Totalt: 575 träffar
RefereraExporteraLänk till posten
Permanent länk

Direktlänk
Referera
Referensformat
  • apa
  • ieee
  • vancouver
  • Annat format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annat språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf